Showing posts with label Painting. Show all posts
Showing posts with label Painting. Show all posts

Sunday, 29 September 2013

Week 23 - Touch ups and Finishing off

We were due to have our PCI this week, however this was postponed as there were still some things not quite finalised.  SS didn't want to present our house to us with not everything finished.


Termite Barriers

This was installed - not quite sure how these are finished off as this is just sitting there!
See the green box and yellow cord along the edge of the concrete.

Exterior Painting

Finally all the timber work around the Exterior was painted - this is one of the things holding things up. There will now be some touch ups required due to some sloppiness!







Front door without the blue paint tape on it!



Stairs Lacquered

Sorry - can only see this through the rumpus window!


Boundary Fence installed





Other Stuff 

Independent Inspection now booked for Monday and then PCI on Thursday.
Still confusion with one vanity basin.
Laundry Chute to finalise (may have been done - just can't see)
Window frame to finish above extended benches in dining room after Essa Stone installation.



Sunday, 15 September 2013

Week 21 - Very close to the end, more finishing touches

Facade & Roller Door


Monument Panelmaster Roller Door is on, great to see the balance of colour.  Just as I type this now, my husband is at the house and sent me a photo of the front door which is now painted Red.  We were at the house yesterday until midday, so it has happened since then!

The Portico is just now waiting to be painted, then the front facade is finished.







Electrical and Technology

Outside Speakers in Grand Alfresco - party time!

Wall Mounted TV set up ready to go
External Powerpoints on Grand Alfresco
 - we put one up each end

Stair lights - I think the very right one should have been
further up???


Tiling Splashback in Guest Suite

As mentioned in previous post, the tiling was not centred on the splashback.  This has now been fixed, even though I was working on the feature tile idea.  However, after now looking at the work, I think it looks fine.



Cut edge on the tile looks fine.
Can see how the tiling is more centred to
everything else now.


 Some Fix Ups


This corner needed to be fixed as it was not plum.
You can also see the Bolero Laminate Flooring added in the hallway through the doorway.



Downstairs linen cupboard - we had to remove the top shelf so the clothes that fall through the linen chute directly above have somewhere to fall too!



This is currently where the laundry chute needs to be finished with some laminate type timber and obviously neatened up.

Laundry Chute upstairs, still needs hole cut so the clothes have somewhere to go!



Bolero Laminate Flooring - Rustic Coffee


This was laid on Friday


















Friday, 6 September 2013

Week 20 - Fit offs galore!

A meeting on site today with my SS enabled me a good look around and a photo opportunity.  Lots has happened over the last 2 weeks inside, I just couldn't get in to have a good look.


Wardrobe and Cupboard Fit outs

Slight problem in the first picture as the laundry chute is to come down through the LHS of this cupboard.  The shelving is in the way.  Working on a solution with SS.
Laundry - Linen Cupboard
Master - WIR (LOVE IT!)

For our friends - the GUEST wardrobe

Walk in Pantry
Walk in Pantry

Bathroom Fit Offs

Nearly there with the bathrooms.  Plumbers there today installing the bath, still need to do basins and basin tapware.  All shower tapware done.  We will look at some changes to tapware post handover!
Mirrors came through the door as I was there....


Master Ensuite










 Toilet - Lifestyle Upgraded model



 Powder Room Vanity



Guest Ensuite and Shower

I wasn't happy with the splashback on the vanity here.  The vanity is 800 wide and the 2 tiles on the splashback are not even, ie 1 is smaller than the other, so therefore the grout line in the middle, looks off centre to the cupboards and vanity hole.  After chatting with the SS, I now understand why.  He said they could fix it up to be lined up, but because of the size of the tile, there would be a raw cut edge along the RHS of the splashback tile which would look rough and unfinished.  So I then asked, what if I was to get the feature tile as per our powder room.  This is an option, however I would have to arrange them and get them to site.  So decision time:
A.  Leave it as is - see 3rd photo below
B. Get the tiles replaced with the grout lined up, however will end up with rough looking tile on outer RHS edge.
C. Source some more tiles from National Tiles as shown here in photo 2 (this is what is left over) of our feature tiles and have this to replace the others.  In process of doing this and pricing it now.


Grout line is totally not centre to everything else on splashback!
Shows the lines not centred (excuse photo taken through window!)



Main Bathroom

Plumbers were putting the bath in as we were there.  Can't wait to use it!!!!





Laundry

Just excuse all the dust!




 



Garage - Internals

Astonishing that all the work goes on around the continual mess on the floor!

There photos show nicely the different colours.  On the LHS is the Stepney Render (Dulux), on the RHS is the Alabaster Wall Paint (Wattyl)






Cooling/Heating Vents

These have all been installed throughout.

Return air vent in - still no change to
Laundry Chute Cupboard upstairs -
needs finishing off.

Electricals 

Yesterday there were wires hanging everywhere, at 9am this morning there were downlights everywhere.  Trusty electricians busy putting all the fixtures on - downlights, exhaust fans, chinaman hats (ugly as they are!), powerpoints etc. 

Oh, we also have a doorbell!





So we are tracking for Handover by the end of the month.  All other trades booked in to complete everything.....lets see!  Should be flooring next week.